100 benches done!

Finally we’ve finished the job at 14 days. Basic score:

* 2 men
* 14 days
* 100 benches made (to be correct: 103, but we gave 3 of them to others)
* 70 pallets destroyed (or ‘remastered’ ;-))
* 10.000 nails removed
* 1000 planks ripped of pallets
* 3000 screws screwed
* 800 cuts with hand saw
* 250 beers drunk

P1000758

woodcore Gang

We accept any other challenges of the woodcore stuff, contact us at k@mo.ubal.to